| Old Post Office Building | ||||
| Return to Projects |
A nearby downspout was exposed. Although moisture
was appearing nearby, the downspout and brick were dry.
Since the downspout at this location was ruled out as the main source of leaking,
further examination of a window on the floor above the test area was suggested.
| |||
| Home | Copyright© 2004 Dell Corporation All Rights Reserved. |